3121 Dot Drive Amberley Ohio Real Estate For Sale

3121 Dot Drive
Amberley, Ohio
4 Bed, 2 1/2 Bath
Offered at $335,000
 

Complete renovation of an Amberley gem! Move right in and relax, knowing that all of the updates to this beautiful home have already been done! The entirely new gourmet kitchen provides a great space for cooking leisurely meals, while the large lower level recreation room with wet bar provides plenty of room for hosting guests. Smart, stylish updates abound throughout the house, are too numerous to list. Great floor plan,  great attention to detail, great value! All of this on a quiet, cul-de-sac street. Don’t wait!

Featured Updates Below The Map!

Pictures of 3121 Dot Drive

Location Map








- Your New Home

FEATURED UPDATES

Removed all old cabinets, appliances, counters, mirror backsplash – Winter 2009
Refinished hardwood floors – Winter 2009
Removed wallpaper from walls and ceiling – Spring 2009
Repaired plaster and updated electrical: including the addition of several dedicated circuits –
Spring 2009
Painted ceiling and walls – Spring 2009
New cabinets and Corian® counters, double integral sink with new faucet – Summer 2009
New stainless steel refrigerator, dishwasher, microwave and double oven – Summer 2009
In-Sinkerator® garbage disposal – Summer 2009
Ran new venting duct work for stove vent (on microwave) – Summer 2009
New track light installed – Summer 2009
Installed new ceramic tile backsplash – Summer 2009

Entry Hall:
New nickel brushed hardware installed on front door – Winter 2009
Removed textured wallpaper – Winter 2009
Removed wall mirrors from two walls – Winter 2009
Refinished hardwood floors – Winter 2009
Replaced skylight lights – Winter 2009
Plaster skim coat on walls – Fall 2009
Painted walls – Fall 2009
Painted coat closet – Spring 2009
Installed new and painted baseboard molding – Fall 2009
Installed new electrical outlets and switches – Fall 2009
Painted and installed mirror frame – Winter 2010
Painted mail drop box and replaced knob – Winter 2010
Painted front and back of the front door – Fall 2011
Painted and installed new six panel doors on coat closet and basement – Winter 2011

Living Room:
Removed old baseboard and forced air cover – Winter 2009
Refinished hardwood floors – Winter 2009
Removed old trim molding and repaired wall plaster – Fall 2009
Removed old paneling and trim above the mantle and installed new drywall – Fall 2009
Repaired textured ceiling – Fall 2009
Painted stone work around the fireplace – Fall 2009
Built and painted new mantle – Fall 2009
Painted ceiling, walls and trim, including new baseboard trim – Winter 2010
Installed new electrical outlets and switches – Winter 2010

Dining Room:
Removed old trim and baseboard molding – Winter 2009
Refinished hardwood floors – Winter 2009
Plaster skim coat on all walls – Winter 2010
Painted ceiling and walls – Winter 2010
Painted folding doors – Fall 2011
Painted and installed new crown and baseboard molding – Fall 2011
Painted and installed new six panel door with brushed nickel hardware – Fall 2011
New electrical outlets and switches installed – Fall 2011

Den/Family Room:
Repaired damaged wall – Winter 2009
Removed old built-in shelf from wall with fireplace – Winter 2011
Installed cabinet doors on either side of fireplace – Summer 2011
Replaced recessed lights and breakfast bar lights– Summer 2011
Exposed and sealed brick above breakfast bar – Summer 2011
Painted ceiling, walls and trim – Summer 2011
Updated electrical switches and outlets – Summer 2011

Hall Bathroom:
Removed flamingo pink tiles, toilet, sink and tub – Winter 2009
Replaced and repaired plaster/drywall – Spring 2010
Installed ceramic tile floor – Spring 2010
Installed new vent/light combo – ran new venting through the attic to soffit – Spring 2010
Painted ceiling and walls – Spring 2010
Installed new toilet, vanity, counter and fixtures – Summer 2010
Installed new tub and surround with new fixtures – Summer 2010
Installed new lights, mirrors and medicine cabinet – Summer 2010
Painted linen closet and replaced hardware – Summer 2010
Installed new towel bars and toilet paper holder
Painted and installed new baseboard molding – Fall 2010
Installed new six panel door with brushed nickel hardware – Winter 2012

Master Bedroom:
Removed carpet and padding – Winter 2009
Removed built-in drawers from closet – Winter 2009
Refinished hardwood floor – Winter 2009
Stripped wallpaper from walls – Winter 2009
Removed trim and baseboard molding – Winter 2009
Repaired plaster walls and ceiling – Summer 2010
Painted ceiling and walls – Summer 2010
Installed new ceiling fan and light – Summer 2010
Painted and installed new crown and baseboard molding – Summer 2010
Replaced electrical outlets and switch – Summer 2010
Installed custom closet organization unit by ClosetMaid® – Fall 2010
Installed custom sliding doors on closet – Fall 2010
Installed new closet light with dual switches – Fall 2010
Installed new six panel door with brushed nickel hardware – Winter 2012

Master Bathroom:.
Stripped old wallpaper – Fall 2009
Removed full-wall mirror and old vanity combo – Fall 2009
Ran a new vent through attic to soffit – Fall 2009
Painted ceiling and walls – Fall 2009
Replaced toilet with water efficient model – Fall 2009
Installed new light – Fall 2009
Installed new sink/vanity with granite counter and new fixtures – Fall 2011
Installed new six panel door with brush nickel hardware – Fall 2011

Green Bedroom:
Removed carpet and old trim molding – Winter 2009
Refinished hardwood floor – Winter 2009
Repaired plaster on ceiling and walls – Fall 2011
Painted ceiling, walls and closet – Fall 2011
Painted and installed new custom baseboard molding – Fall 2011
Replaced electrical outlets – Winter 2012
Replaced ceiling fan/light – Fall 2011
Installed new six panel door with brushed nickel hardware – Winter 2012

White bedroom:
Removed built-in drawers from closet and built-in vanity/dressing table area – Winter 2009
Refinished hardwood floor – Winter 2009
Repaired wall from built-in gap – Winter 2010
Replaced ceiling fan – Fall 2010
Painted ceiling, walls and trim – Fall 2010
Installed new six panel door with brushed nickel hardware – Winter 2012

2nd Floor Hallway:
Removed carpet – Winter 2009
Refinished hardwood floor – Winter 2009
Installed digital, programmable thermostat – Spring 2009
Stripped textured wallpaper – Spring 2009
Repaired plaster on walls and ceiling – Spring 2009
Painted ceiling and walls – Summer 2010
Installed new light fixture – Summer 2010
Painted stair risers and trim – Fall 2011
Replaced light switches – Winter 2012

Office:
Removed bright orange built-in laminate desk/work space – Winter 2009
Repaired walls and ceiling – Winter 2009
Painted walls, ceiling and closet – Winter 2009
Painted and installed new baseboard molding – Winter 2009
Painted door and installed new brush nickel hardware – Fall 2011
Replaced electrical outlets – Winter 2012

Yellow Bedroom:
Removed carpet and baseboard molding – Winter 2009
Refinished hardwood floor – Winter 2009
Extensive plaster repair to walls and ceiling – Winter 2009
Painted walls, ceiling and closet– Winter 2009
Installed new light fixture – Winter 2009
Painted and installed new baseboard molding – Fall 2011
Painted door and installed new brushed nickel hardware – Fall 2011

3rd Floor Hallway:
Removed carpet and baseboard molding – Winter 2009
Refinished hardwood floor – Winter 2009
Stripped wallpaper – Winter 2009
Removed old intercom speaker and wire – Winter 2009
Repaired wall – Fall 2011
Painted ceiling and walls – Winter 2012

Movie Room / Rec Room:

Replaced carpet – Winter 2009
Removed excess lighting and shelving – Winter 2009
Painted closets – Winter 2009
Installed new light in rec room – Summer 2010
Installed new vinyl flooring – Fall 2011
Painted walls and ceiling – Fall 2011

Mudroom/Laundry:
New washer and dryer – Winter 2009
New carpet on stairs – Winter 2009
New vinyl floor – Fall 2011
Repaired plaster on walls and ceiling – Fall 2011
Installed new light fixture – Fall 2011
Painted ceiling and walls – Fall 2011
New door hardware installed – Fall 2011

Half Bath:
Installed new vanity/sink and mirror – Fall 2011
Repaired and painted ceiling – Fall 2011
New vinyl floor – Fall 2011
Painted walls – Fall 2011
Installed more efficient, double-hung window – Winter 2012

Whole –house Interior Updates:
Installed new water heater – Winter 2009
Added insulation in the attic – Fall 2009

Whole –house Exterior Updates:
Re-flashed and repaired roof around the back chimney box – Spring 2009
Removed various dead bushes, shrubs and trees – Spring 2009
Built and installed three wooden gates – Spring 2009
Removed decrepit stairs from west side of house – Spring 2009
Built and installed new stairs on the west side of the house – Spring 2009
Replaced various gutters and downspouts – Summer 2009
Replaced various pieces of siding that was in disrepair – Summer 2009
Refinished copper roofing over bay window – Summer 2009
Painted the exterior of the house – Summer 2009
Removed old, rotted deck – Summer 2010
Installed new French drain around patio – Summer 2010
Built new deck and stairs on back of house – Summer 2010
Built new railing and stained deck and patio on back of house – Summer 2011
Repaired and stained back fencing – Summer 2011

This entry was posted in Cincinnati Real Estate, Featured Listings, Homes For Sale. Bookmark the permalink.

Comments protected by Lucia's Linky Love.